North FW Livingthe alliance corridor field guide

Guides · The 90-day timeline

Ninety days, counted backward from your first day.

The corridor move has a natural order. Here it is as a calendar, with each task linked to the page that does it properly.

Days 90–60: the map phase

Badge geometry mapped honestly → pockets shortlisted from the profilesdistrict verified for every candidate address → the scouting trip: commutes driven at real hours, finalists walked at night. Decide the fork: rent-first or buy-now.

Days 60–30: the commit phase

Rent path: applications with documents ready, specials verified three ways, net-effective compared, lease signed with the notice window calendared. Buy path: full underwriting → tours with the Ledger open → contract with the option period doing its job: inspections, HOA documents, total tax rate in writing.

Days 30–7: the logistics phase

Movers booked, utilities scheduled (electric homework done), address changes filed, school enrollment paperwork gathered per the district's list.

Day 7 to day one

Walkthrough/move-in photos timestamped, the Texas admin sequence started, the first weekend protected on the calendar — it's load-bearing. Then the settling guide takes over. The interactive version of all of this: the checklist. Compiled August 2026.

Get the Ledger before the incentives change.

Early-list members get each Alliance Builder Ledger update first, plus a heads-up when corridor incentive conditions shift. First access when full service opens. Zero spam. Leave anytime.