The typical shape
Corridor builders commonly structure coverage in tiers — often described as 1-2-10 or similar: roughly a year on workmanship and materials, an intermediate period on major systems (plumbing, electrical, HVAC distribution), and a longer term on defined structural elements. The words "defined" carry weight: cosmetic issues, settling within stated tolerances, and maintenance items are typically excluded, and coverage terms vary builder to builder. Your specific warranty booklet — not the sales conversation — is the contract.
Claiming so it counts
Report in writing through the builder's stated process (portals and email create records; hallway conversations don't), photograph everything with dates, and keep a running log from day one. Batch non-urgent items but never sit on anything approaching a deadline. If a repair is attempted, document the outcome — repeat issues are their own category of claim.
The eleventh month
The highest-value habit in this guide: schedule an independent inspection around month eleven, before the workmanship year closes. It converts everything the house revealed in its first four seasons — the corridor's clay-soil summer being the great revealer — into one documented claim while the broadest coverage still applies. Calendar it at closing. Educational only, August 2026; warranty documents govern.
Get the Ledger before the incentives change.
Early-list members get each Alliance Builder Ledger update first, plus a heads-up when corridor incentive conditions shift. First access when full service opens. Zero spam. Leave anytime.